Tower crane equipment is how to erect the tower is the most secure

Now, in some large-scale construction, a lot of tower crane rental equipment will be used. For the tower crane, some problems should be paid attention to when erecting the tower.
Should control the controller, limit switches and other electrical equipment to check the control panel to remove the operating room, installed in the outdoor bracket, easy to operate when standing tower.
Clamp the rail forceps and wedge the anti-slip wedges under the running wheels.
In order to strengthen the rigidity of the gantry, cross gantry can be tied on both sides of the gantry.
Prior to starting the job responsibilities should be provided, strict division of labor and command contact signals. The inspection of the main anchor should be undertaken by an experienced lifting personnel. When anomalies such as looseness are found, take immediate measures to stop it (increase the weight on the anchor).
Start the winch, so that the tower off the Road about 20mm, immediately shut down, check the various components of the intact situation.